BILL OF MATERIALS | ENGINEERING | MANUFACTURING

Materials COLLABORATION

Engineering-BOM, Manufacturing-BOM, Small or Massive we treat this with the precision and flexibility it deserves.

  • Changes flow as versions are committed.

  • All versions sync and update.

  • Formats between systems changing levels and layouts.


bom_types_aerospace.png

Neural uses abstractions which are live virtual versions of the bill of materials. Allowing many versions to be both accessible and merged upon a commit date.

Dual BOMs have advantages far beyond the serial motion processes of the single BOM.

  • Response time and sequence changes

  • Changes processes are decoupled between functional groups. So an engineering change does not require time from other departments.

 

BILL OF MATERIALS MANAGEMENT

Materials_BOM_Management.PNG

Each functional group performs there duties and contribute in the manner they need. Engineering, Sourcing, Buying all work on the E-BOM/M-BOM or Quotable BOM at the same time.